When trust translates into an artwork
The Museum of Modern Art in Warsaw is conceived as one of the most modern cultural buildings in the world. This building will not only delight art lovers, but will also provide an unforgettable experience for architecture and construction enthusiasts.
Reusing the maximum amount of material possible and reducing on-site deadlines
The Zumelegui viaduct is part of the high‑speed railway platform that will connect the three main cities of the Basque Country. Known as the "Basque Y" due to its geometry, it will have three lines and a central junction located at the same point. When designing the project of Zumelegi, priority was given to reusing the maximum amount of material possible and reducing on-site deadlines.
Efficiency with ULMA systems in the restoration of The Royal Columbian Hospital
The redevelopment of the oldest hospital in New Westminster, Vancouver, will expand its services with new facilities: a 10-storey intensive care building, expansion of the emergency and maternity ward, new operating theatres, among others.
Formwork, shoring and scaffolding solutions for the Vicuña Mackenna 20 building in Chile
The Vicuña Mackenna 20 project is a large-scale initiative promoted by the University of Chile which consists of a building located next to Plaza Italia and which will house in the future the Faculty of Government, the Institute of International Studies and the Centre for Artistic and Cultural Extension.
WaltherPark, construction of a multifunctional building in the historic heart of Bolzano
WaltherPark is an urban requalification project in Bolzano, Italy, for the restructuring and enhancement of a central district located just next to the railway station and Piazza Walther, the city's main square near Bolzano Cathedral.
Comuneros II Bridge: ULMA present in strategic projects in Peru
The bridge located in the region of Junín, Peru, is a project that generates great expectations in the population, as it will decongest vehicle traffic in an area characterised by the few roads that cross the Mantaro River.
Good reception of the ONADEK modular recoverable slab formwork at Bauma Conexpo India
ULMA has been present at the international trade fair Bauma Conexpo India, 2023 making a very positive valuation in terms of the number and quality of the visits received at the stand.
New Pattullo Bridge in Canada
Crossing the Fraser River, the Pattullo Bridge is a key connection between New Westminster and Surrey in British Columbia. The bridge, which is more than 80 years old and does not meet modern design standards, is being replaced with a new bridge that will improve safety and reliability for drivers, cyclists, and walkers, as well as goods movement.
Poland's longest span with successive cantilever technology
The new bridge over the Dunajec River is part of the construction of the link between the A4 motorway in Wierzchosławice and the SAG industrial area in Tarnów, Poland.
Restoration of the Vasco da Gama cable-stayed bridge, Lisbon
The Vasco da Gama Bridge is a cable-stayed bridge over the Tagus River connecting the municipality of Alcochete with Lisbon, Portugal. At over 17.3 km, it is the second longest bridge in the European Union.
Get into the heart of ULMA with Showroom Immersion
Live the Showroom Immersion experience. In this immersive experience in our showroom, you can take a 360º tour to learn more and better about our solutions and our projects.
Architectural concrete finishes in downtown Belo Horizonte
The 'Catedral Cristo Rei' is under construction in Belo Horizonte and, when completed, will be the new headquarters of the Catholic Church in the city. The project, one of the last designed by the Brazilian architect Oscar Niemeyer between 2006 and 2010, will be a landmark building in the city.
New cut-and-cover tunnel with ULMA
The S3 motorway construction project comprises a new road tunnel (TS-32), around 320 m long, on the Legnica-Lubawka stretch near Gostków, Poland. The structure, which consists of two galleries, was built using the cut-and-cover tunnel construction method. Each will have two 3.5 m wide lanes plus a 2.5 m wide emergency lane.
Be faster with less labour costs, now possible with BATEK
The breakthrough in one-sided tying formwork systems. BATEK is a high-performance-assembly formwork for all types of vertical concrete structures aimed at both the building construction and civil engineering sectors. It is designed to effectively and safely solve all types of geometries, providing excellent concrete finishes every time.
ULMA collaborates in the FSC Forest Week from September 24 to 30
By obtaining the Forest Stewardship Council (FSC®) certification, ULMA is doing its part to guarantee responsible forest management practices, thus protecting biodiversity and numerous ecosystems.
ATR, RKS and HWS systems key in the construction of 6 towers in Gibraltar
HCT Gibraltar is a project with 665 state-subsidised properties developed and promoted by the Government of Gibraltar, the largest residential construction underway now and in the years to come.
ONADEK, the new era in forming decks
In 2017, the first project with ONADEK was completed in Germany and now, over 15 construction projects are underway in the country. The building construction market is entering a new era for slab formwork systems with ONADEK.
Smart products: latest technology to offer the best service to customers
The digital tools that we are developing at ULMA add intelligence to our products and, in this case, to our scaffolding ranges: BRIO and DORPA. We use the latest technology to improve internal processes, allowing us to offer the best possible service to customers
The MBP protection system ensures safety in the construction of a 'Smart city' in Bergamo
The first Smart City project has been launched in Bergamo, regenerating 150,000 m² of one area in the city. ULMA, in addition to offering shoring and formwork solutions, has guaranteed safety throughout the entire process.
REVIT® Design: Cebu-Cordova link expressway, 3D technical solution
One of the largest infrastructure projects carried out in the Philippines. The bridge consists of two octagonal pylons, variable on all sides and 150 metres high.
Special solutions for an office complex in Warsaw, Poland
In Warsaw, the Forest office and service complex, a 120-metre high skyscraper, is under construction. The new building will be a green oasis, with green areas the size of two football pitches.
Large amount of equipment for the construction of Portugal's first high-speed railway section
Within the National Railway Plan, the 80-km Évora-Elvas line will become the first high-speed section of a line in Portugal, used to transport freight and passengers.
Presence on the site was the key to success in the construction of offshore platforms in Mexico
The EK-BALAM oil field, located off the shores of the Gulf of Mexico, will be increasing its production capacity with a new offshore platform called BALAM-TA2. The structure is being constructed in two parts, in the ESEASA Offshore yard.
Big news today!
We have just published the Construction Book, which highlights some of our most noteworthy projects of the last few years. We have updated our image, our slogan, and our graphic design, though our essence is still the same: you, our customer, remain the protagonist.
Convex mixed-use building rises next to the Brooklyn Bridge
Unique shoring solutions are required to meet the distinctive curvature design of the structure.
HWS formwork ensures construction safety at the Mirabella complex, Canada
Located at 1926 Lake Shore Boulevard West, Toronto, the Mirabella Luxury Condominiums is a two-tower community that offers a premium location, situated across from Sunnyside Park on the shores of Lake Ontario, with stunning views of the City of Toronto skyline and north views to High Park.
H-33 Truss, modular and load-bearing solution in the construction of two bridges in Kraków
Two new bridges over the Vistula are under construction in Kraków: the M1 and M3. The first will be used by long-distance trains and the second by local trains. The separation of long-distance and local traffic will improve the passage of trains through the area considerably, allowing for an increase in service coverage, shortened journey times, and enhanced passenger comfort and safety.
Solution for a 240 metre span with the Balanced cantilever method
On the Cuiabá River in Brazil, construction is underway on a new bridge in balanced cantilever method that will link the Parque do Lago in Várzea Grande with the Atalaia Park in the capital. The main challenge has been not to impair or interrupt the navigability of the river.
Barcelona’s new Transportation Hub
The new Sagrera Station is the most important infrastructure development to be built in Barcelona since the Olympic Games. The station will be the largest building in the city and the second largest in the metropolitan area, after T1 at El Prat Airport, and will be the biggest urban transformation the city has seen in recent decades.
New tower in the centre of Lima, Peru
Torre República is the second building of the emblematic Capital Centre project located in the financial centre of San Isidro in Lima, Peru.